Wednesday, November 6

Tag: Guards

Indian Railway Acquiring Technology To Run Trains Without Guards
INDIA

Indian Railway Acquiring Technology To Run Trains Without Guards

The Indian Railways will float global tenders worth over Rs 100 crore for acquiring sophisticated equipment to run 1000 trains without guards. The End of Train Telemetry (EoTT) equipment is used to establish communication between the locomotive driver and the last wagon of the train to ensure that the train is running with all coaches/wagons as a complete unit. The equipment is designed to do the guards job by giving indication to the loco driver in case of parting of coaches or wagons from the rear side of the train. Each set of EoTT device is estimated to cost approximately Rs 10 lakh. EoTT system comprises two units one unit called cab display unit (CDU) fitted on the locomotive and the other is sense and brake unit (SBU) fitted on the last coach or wagon of the train. Bo...